

1. | 
1. The first step was to decide that we're going to build a new studio at this place. What a mess! Who's stupid idea was that? |


2. | 
2. Unwanted door to the garage had to be removed. We wanted a solid wall. |

- 
3. | 
3. Fixing the door problem |

......... 
4. | 
4. Got to do something about those pipes...Let's paint them white...But once dry: WTF?
Houston we have a problem! Cheap paint sucks! |


5. | 
5. 3D sketch over the studio. The next step is to put up the wall sections 1, 2 and 3. |


6. | 
6. Wall section 1 comming up |

- 
7. | 
7. Wall sections 2 and 3. The last one a bit tricky... |


8. | 
8. Building the entrance between wall sections 2 and 3. |


9. | 
9. Classic Sfi-Fi entrance. Painting everything in white. |

10. | 
10. Building audio deflectors... |


11. | 
11. Eliminating the 90 degree problem between the wall and the roof. These are also going to work as bass traps. |


12. | 
12. Everywhere in the control room. Mounting of the camera/motion detection alarm system. |


13. | 
13. Bass traps in the corners with damping panels. |


14. | 
14. Front view of the result. |


15. | 
15. Fixing some lights. Mounting RGB LED strips |


16. | 
16. These are going up on the wall. Making sure there is some space between the LEDs and the wall, otherwise you'll get those common annoying dots. |


17. | 
17. Testing the lights on the wall. A cable channel on the top makes only the reflected light visible and can also hold cables. Looking nice and smooth. Good job! |


18. | 
18. More LED lights with same principle. Mounting power distribution at strategic places |


19. | 
19. LED spotlights to be mounted on top of the bass traps in the corners |


20. | 
20. Power distribution for all the lights. Radio controlled receivers. |


21. | 
21. Main power switch. Radio controlled. One push of a button on the remote will power on the entire studio. Really cool. |


22. | 
22. Testing the front lights and the new 48" smart TV screen mounted on the wall. |


23. | 
23. Testing the side lights. Final touch on the entrance. |

24. | 
24. Soldering more control cables for the lights at my new and small workspace. |